1. Starting Height (Low Point)
The lowest point of the sloped ceiling above the finished floor.
2. Peak Height
The highest point of the sloped ceiling above the finished floor.
3. Reflected Ceiling Plan Length
The horizontal run as dimensioned on the reflected ceiling plan.
Pitch Diagram
C = √(A² + B²)
Rise (B)Flat Plan Length (A)Actual Ceiling Length (C)
Results
Enter the RCP Flat Length above to see results
Starting Height and Peak Height are optional — leave at 0 for a flat ceiling.